sUnb1 Deining Unterbuchfeld 1 solar project is a solar farm in Germany with a capacity of 4.6 MW, commissioned in 2023. It is operating and is owned by WP Invest 3 GmbH & Co. KG.
In 2024 it settled 3.1 GWh of electricity, a load factor of 7.7%. That volume was settled under EEG support.
Its EEG support runs to the end of 2043, after which that output is sold at market prices.
This asset produced at 7.7% of nameplate in 2024 — the 21st percentile of German solar commissioned 2020 or later (1,271 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE935604973835); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets