Solar farm

Walp PV Teil 1 solar project

Walp PV Teil 1 solar project is a solar farm in Germany with a capacity of 5 MW, commissioned in 2023. It is operating and is owned by Walp PV GmbH.

In 2024 it settled 3.3 GWh of electricity, a load factor of 7.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Measured performance vs peers
7.6%
This assetCohort median 9.7%Middle half

This asset produced at 7.6% of nameplate in 2024 — the 20th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
5 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Walp PV GmbH
Technology
PV
Measured output 2024
3.3 GWh
Load factor
7.6%
EEG support ends
2043
Peer percentile
20th
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE964326732062); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets