Wind farm

Bescheid Süd wind farm

Bescheid Süd wind farm is a wind farm in Germany with a capacity of 17 MW, commissioned in 2023. It is operating and is owned by Windpark Bescheid-Süd GmbH & Co. KG.

In 2024 it settled 20.5 GWh of electricity, a load factor of 13.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2043, after which that output is sold at market prices.

Measured performance vs peers
13.8%
This assetCohort median 23.8%Middle half

This asset produced at 13.8% of nameplate in 2024 — the 8th percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
17 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Windpark Bescheid-Süd GmbH & Co. KG
Technology
Onshore
Measured output 2024
20.5 GWh
Load factor
13.8%
EEG support ends
2043
Peer percentile
8th
Grid connection
HS
State
Rheinland-Pfalz

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE902677050817); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets