Wind farm

Klobbicke wind farm

Klobbicke wind farm is a wind farm in Germany with a capacity of 23 MW, commissioned in 2022. It is operating.

In 2024 it settled 1.9 GWh of electricity, a load factor of 0.9%. That volume was settled under EEG support.

Capacity
23 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
Technology
Onshore
Measured output 2024
1.9 GWh
Load factor
0.9%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap