Solar farm

Treier Solar Erweiterung solar project

Treier Solar Erweiterung solar project is a solar farm in Germany with a capacity of 1.8 MW, commissioned in 2024. It is operating and is owned by Treia Solar GmbH & Co. KG.

In 2024 it settled 1.1 GWh of electricity, a load factor of 6.8%. It sold essentially all of that volume outside EEG support — it is already merchant.

Peer comparison unavailable

Commissioned 2024, settled 2024 — a partial year of output over a full year of nameplate. Not comparable.

Capacity
1.8 MW
Country
Germany
Status
operating
Commissioned
2024
Owner
Treia Solar GmbH & Co. KG
Technology
PV
Measured output 2024
1.1 GWh
Load factor
6.8%
Grid connection
MS
State
Schleswig-Holstein

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE998058252284); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets