Solar farm

Anlagenteil Ost solar project

Anlagenteil Ost solar project is a solar farm in Germany with a capacity of 2.4 MW, commissioned in 2024. It is operating.

In 2024 it settled 646 MWh of electricity, a load factor of 3.1%. It sold essentially all of that volume outside EEG support — it is already merchant. This figure is apportioned across units of the same site that share a registry entry.

Capacity
2.4 MW
Country
Germany
Status
operating
Commissioned
2024
Owner
Technology
PV
Measured output 2024
646 MWh
Load factor
3.1%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap