Energy assets in Türkiye

3,548 tracked assets, largest first. Country overview →

Türkiye generation mix by capacity

hydro: 26.5 GW (24.9%)gas: 25.5 GW (23.9%)coal: 20.5 GW (19.2%)solar: 16.5 GW (15.5%)wind: 14.0 GW (13.1%)geothermal: 1.9 GW (1.8%)Other: 1.7 GW (1.6%)106.5 GWtotal
  • hydro26.5 GW24.9%
  • gas25.5 GW23.9%
  • coal20.5 GW19.2%
  • solar16.5 GW15.5%
  • wind14.0 GW13.1%
  • geothermal1.9 GW1.8%
  • Other1.7 GW1.6%

Installed capacity of operating assets, not electricity generated — a GW of solar and a GW of gas do not produce the same energy in a year.

Capacity built per year

BuiltUnder construction

106.5 GW operating across 3,554 tracked assets, 6.7 GW under construction · last five years down 56% on the five before.

2.14.36.48.5GW1990: 302 MW built1991: 662 MW built1992: 2.9 GW built1993: 84 MW built1994: 579 MW built1995: 300 MW built1996: 253 MW built1997: 240 MW built1998: 935 MW built1999: 1.9 GW built2000: 1.0 GW built2001: 823 MW built2002: 3.0 GW built2003: 3.8 GW built2004: 1.1 GW built2005: 1.1 GW built2006: 1.4 GW built2007: 1.1 GW built2008: 614 MW built2009: 1.9 GW built2010: 4.2 GW built2011: 3.4 GW built2012: 2.6 GW built2013: 6.6 GW built2014: 5.3 GW built2015: 4.0 GW built2016: 5.3 GW built2017: 8.5 GW built2018: 5.4 GW built2019: 2.2 GW built2020: 4.7 GW built2021: 1.9 GW built2022: 2.2 GW built2023: 5.0 GW built2024: 2.1 GW built2025: 663 MW built2026: 0 MW built2027: 1.2 GW under construction2028: 1.2 GW under construction19901995200020052010201520202025
Cumulative operating capacity
GW51103
Hover a bar for the year.

Built from assets operating today, by commissioning year — plants that closed before now are not in the data, so early years show only what survived. The forward bars are capacity physically under construction, not a forecast. A further 2.1 GW is under construction with no stated completion year. 6.4 GW of operating capacity has no commissioning year and sits outside the curve. Retirements are not tracked for this country, so no net-capacity line is drawn.

84% of Türkiye’s tracked capacity has an owner recorded.

AssetCapacityOwner
Uşak solar project XVII5.5 MW—
Düzova wind farm5.5 MW—
Düzova wind farm5.5 MW—
Seyitali wind farm5.5 MW—
Adana solar project XXXII5.4 MW—
Amasya solar project XVI5.4 MW—
Antalya solar project XXIII5.4 MW—
Antalya solar project XXX5.4 MW—
Canakkale solar project II5.4 MW—
Erzurum solar project IX5.4 MW—
Gaziantep solar project XXVIII5.4 MW—
Isparta solar project XXIV5.4 MW—
Kamber B solar project5.4 MW—
Konya solar project CXXXVI5.4 MW—
Konya solar project XCV5.4 MW—
Kütahya Merkez solar project VI5.4 MW—
Manisa solar project II5.4 MW—
Nevşehir solar project XIX5.4 MW—
Sivas solar project XXXI5.4 MW—
Sivrihisar solar farm5.4 MW—
Turhal solar project5.4 MW—
Türkiye solar project CCLII5.4 MW—
Türkiye solar project CCVII5.4 MW—
Türkiye solar project XXIX5.4 MW—
Uşak solar project XLIII5.4 MW—
Yakutiye solar farm5.4 MW—
Çorum solar project XIII5.4 MW—
Şanlıurfa solar project XL5.4 MW—
Afyonkarahisar solar project XLV5.3 MW—
Amasya solar project VIII5.3 MW—
Antalya solar project XLVI5.3 MW—
Bilecik solar project III5.3 MW—
Edirne solar project V5.3 MW—
Erzurum solar farm5.3 MW—
Erzurum solar project XXIX5.3 MW—
Eskişehir solar project XXXIX5.3 MW—
Gaziantep solar project XXXII5.3 MW—
Konya solar project XLI5.3 MW—
Kırşehir solar project XII5.3 MW—
Muğla solar project VI5.3 MW—
Nevşehir solar project XXV5.3 MW—
Sinop solar project I5.3 MW—
Türkiye solar project CLII5.3 MW—
Türkiye solar project CXLVIII5.3 MW—
Türkiye solar project CXVI5.3 MW—
Türkiye solar project LXXXII5.3 MW—
Türkiye solar project XLVII5.3 MW—
Yalnizpinar solar farm5.3 MW—
Yozgat solar project XXXIV5.3 MW—
Adana solar project XXV5.2 MW—
Adana solar project XXVI5.2 MW—
Afyonkarahisar solar project XXIV5.2 MW—
Afyonkarahisar solar project XXXIV5.2 MW—
Akmezra A solar project5.2 MW—
Denizli solar project XIX5.2 MW—
Denizli solar project XLIX5.2 MW—
Dogalar solar farm5.2 MW—
Doğutepe Mahallesi solar project I5.2 MW—
Erzurum solar project IV5.2 MW—
Kars solar project II5.2 MW—
Kayseri solar project LXXXVIII5.2 MW—
Konya solar project CXXXV5.2 MW—
Konya solar project LXVI5.2 MW—
Muğla solar project XII5.2 MW—
Tercan solar farm5.2 MW—
Türkiye solar project CCLXX5.2 MW—
Türkiye solar project CCXLV5.2 MW—
Türkiye solar project CXXXI5.2 MW—
Türkiye solar project XXVIII5.2 MW—
Afyonkarahisar solar project VIII5.1 MW—
Afyonkarahisar solar project XLIV5.1 MW—
Antalya solar project XVII5.1 MW—
Aydın solar project XXI5.1 MW—
Buyukbahce Hybrid solar project5.1 MW—
Dilek Hybrid solar project5.1 MW—
Eskişehir solar project IV5.1 MW—
Eskişehir solar project XIII5.1 MW—
Gaziantep solar project XLVII5.1 MW—
Gaziantep solar project XVII5.1 MW—
Hatay solar project V5.1 MW—
Incesu B solar project5.1 MW—
Ispir solar farm5.1 MW—
Kahramanmaraş solar project XXXI5.1 MW—
Osmaniye solar project II5.1 MW—
Sirimtas Hybrid solar project5.1 MW—
Türkiye solar project CCXCIV5.1 MW—
Türkiye solar project CLXXXIV5.1 MW—
Türkiye solar project LXX5.1 MW—
Türkiye solar project LXXI5.1 MW—
Türkiye solar project XLIII5.1 MW—
Türkiye solar project XLIX5.1 MW—
Uşak solar project XXX5.1 MW—
Çorum solar project XXXVII5.1 MW—
Şanlıurfa solar project XXIX5.1 MW—
Fener wind farm5.1 MW—
Adana solar project VIII5 MW—
Afyonkarahisar solar project LXXIII5 MW—
Arac Baraji ve Hybrid solar project5 MW—
Bursa solar project XVI5 MW—
Eskişehir solar project LXI5 MW—
Gülşehir solar project I5 MW—
Ilica 2 solar project5 MW—
Ilica 5 solar project5 MW—
Ilica 6 solar project5 MW—
Isparta solar project VII5 MW—
Kayseri solar project VII5 MW—
Kocaeli solar project XIV5 MW—
Konya solar project CXXII5 MW—
Konya solar project CXXXI5 MW—
Konya solar project LIII5 MW—
Konya solar project XCI5 MW—
Konya solar project XXXII5 MW—
Muğla solar project XIX5 MW—
Sivas solar project VI5 MW—
Sivas solar project X5 MW—
Susurluk Hybrid solar project5 MW—
Tokat solar project I5 MW—
Toprakalle A solar project5 MW—
Türkiye solar project CLXXVIII5 MW—
Türkiye solar project CLXXXII5 MW—
Türkiye solar project XCII5 MW—
Uşak solar project XVI5 MW—
Uşak solar project XVIII5 MW—
Yozgat solar project XXXVII5 MW—
Çorum solar project I5 MW—
Özkonak Beldesi solar project5 MW—
Adıyaman solar project XXVI4.9 MW—
Afyonkarahisar solar project XXIX4.9 MW—
Afyonkarahisar solar project XXXVIII4.9 MW—
Amasya solar project VII4.9 MW—
Antalya solar project XXI4.9 MW—
Burdur Merkez solar project XII4.9 MW—
Giresun solar project IV4.9 MW—
Karaman solar project XIV4.9 MW—
Karaman solar project XVI4.9 MW—
Kırşehir solar project XIV4.9 MW—
Kırşehir solar project XVI4.9 MW—
Muğla solar project XI4.9 MW—
Nevşehir solar project XVII4.9 MW—
Türkiye solar project XXX4.9 MW—
Yozgat solar project XXXVI4.9 MW—
Afyonkarahisar solar project LXIII4.8 MW—
Aksaray solar project XXII4.8 MW—
Aksaray solar project XXVI4.8 MW—
Aydın solar project VIII4.8 MW—
Babil Biyogaz Tesisi solar project4.8 MW—
Bilecik solar project X4.8 MW—
Canakkale solar project XVI4.8 MW—
Denizli solar project III4.8 MW—
Gaziantep solar project XXV4.8 MW—
Geris Hybrid solar project4.8 MW—
Isparta solar project I4.8 MW—
Kahramanmaraş solar project XIX4.8 MW—
Kahramanmaraş solar project XXXIV4.8 MW—
Kayseri solar project IX4.8 MW—
Kayseri solar project XLI4.8 MW—
Konya solar project LX4.8 MW—
Konya solar project XCVI4.8 MW—
Muğla solar project XLI4.8 MW—
Muğla solar project XXI4.8 MW—
Muğla solar project XXXII4.8 MW—
Pitane Hybrid solar project4.8 MW—
Türkiye solar project CCCXI4.8 MW—
Yozgat solar project XII4.8 MW—
Miskevank wind farm4.8 MW—
Taspinar wind farm4.8 MW—
Dora geothermal power plant4.8 MW—
Adana solar project XIV4.7 MW—
Adıyaman solar project XX4.7 MW—
Afyonkarahisar solar project LXXX4.7 MW—
Aydın solar project XVII4.7 MW—
Bilecik solar project XIX4.7 MW—
Bilecik solar project XXII4.7 MW—
Bitlis solar project VIII4.7 MW—
Camseki Hybrid solar project4.7 MW—
Denizli solar project XIV4.7 MW—
Denizli solar project XXII4.7 MW—
Isparta solar project IX4.7 MW—
Istanbul solar project V4.7 MW—
Kadirli solar project II4.7 MW—
Kahramanmaraş solar project XXXII4.7 MW—
Konya solar project XVIII4.7 MW—
Kütahya solar project VIII4.7 MW—
Mersin solar project XXXVI4.7 MW—
Nevşehir solar project XXVII4.7 MW—
Türkiye solar project CCCVI4.7 MW—
Türkiye solar project CCIX4.7 MW—
Türkiye solar project CCXLVII4.7 MW—
Türkiye solar project LVIII4.7 MW—
Türkiye solar project XL4.7 MW—
Uşak solar project VIII4.7 MW—
Şanlıurfa solar project XVI4.7 MW—
Adıyaman solar project XL4.6 MW—
Afyonkarahisar solar project LXXVI4.6 MW—
Aslan Biyogaz solar project4.6 MW—
Bursa solar project X4.6 MW—
Caglayanlar 2 Hybrid solar project4.6 MW—
Canakkale solar project VII4.6 MW—
Cifteler solar farm4.6 MW—
Denizli solar project XXVII4.6 MW—
Eskişehir solar project VII4.6 MW—
Hisar Biogaz solar project4.6 MW—
Isparta solar project LIII4.6 MW—
Kahramanmaraş solar project XXV4.6 MW—
Kayseri solar project V4.6 MW—
Kayseri solar project XXV4.6 MW—
Konya solar project LIV4.6 MW—
Mersin solar project XIII4.6 MW—
Nevşehir solar project XXX4.6 MW—
Sivas solar project XXXVIII4.6 MW—
Tepekisla Baraji ve Hybrid solar project4.6 MW—
Türkiye solar project CCIII4.6 MW—
Türkiye solar project CCXXIX4.6 MW—
Şanlıurfa solar project XXVI4.6 MW—
Afyonkarahisar solar project LIII4.5 MW—
Afyonkarahisar solar project LXXIX4.5 MW—
Gaziantep solar project XL4.5 MW—
Karaman solar project XV4.5 MW—
Konya solar project CII4.5 MW—
Konya solar project LXV4.5 MW—
Konya solar project LXXIII4.5 MW—
Manisa solar project IV4.5 MW—
Mardin Biogaz Santrali solar project4.5 MW—
Osmaniye solar project X4.5 MW—
Sakarya solar project III4.5 MW—
Sivas solar project III4.5 MW—
Türkiye solar project CCXXXVIII4.5 MW—
Uşak solar project IV4.5 MW—
Van solar project VII4.5 MW—
Yozgat solar project XXXIII4.5 MW—
Çorum solar project XXXVI4.5 MW—
Afyonkarahisar solar project LXII4.4 MW—
Bilecik solar project IX4.4 MW—
Bingol Biyogaz Tesisi solar project4.4 MW—
Bingöl solar project II4.4 MW—
Burdur Merkez solar project XI4.4 MW—
Denizli solar project XXIV4.4 MW—
Edirne Merkez solar project4.4 MW—
Kahramanmaraş solar project XXIV4.4 MW—
Kayseri solar project XLIX4.4 MW—
Kayseri solar project XLVII4.4 MW—
Konya solar project XXXV4.4 MW—
Kumrular Biyogaz Santrali solar project4.4 MW—
Kırıkkale solar project XVII4.4 MW—
Mersin solar project VI4.4 MW—
Nevşehir solar project VII4.4 MW—
Niğde solar project XXVIII4.4 MW—
Sivas solar project I4.4 MW—
Türkiye solar project CCXXI4.4 MW—
Türkiye solar project CCXXXIV4.4 MW—
Türkiye energy assets — page 8 · CapexAtlas