Directory · Türkiye

Energy assets in Türkiye

3,548 tracked assets, largest first. Country overview →

Türkiye generation mix by capacity

hydro: 26.5 GW (24.9%)gas: 25.5 GW (23.9%)coal: 20.5 GW (19.2%)solar: 16.5 GW (15.5%)wind: 14.0 GW (13.1%)geothermal: 1.9 GW (1.8%)Other: 1.7 GW (1.6%)106.5 GWtotal
  • hydro26.5 GW24.9%
  • gas25.5 GW23.9%
  • coal20.5 GW19.2%
  • solar16.5 GW15.5%
  • wind14.0 GW13.1%
  • geothermal1.9 GW1.8%
  • Other1.7 GW1.6%

Installed capacity of operating assets, not electricity generated — a GW of solar and a GW of gas do not produce the same energy in a year.

Capacity built per year

BuiltUnder construction

106.5 GW operating across 3,554 tracked assets, 6.7 GW under construction · last five years down 56% on the five before.

2.14.36.48.5GW1990: 302 MW built1991: 662 MW built1992: 2.9 GW built1993: 84 MW built1994: 579 MW built1995: 300 MW built1996: 253 MW built1997: 240 MW built1998: 935 MW built1999: 1.9 GW built2000: 1.0 GW built2001: 823 MW built2002: 3.0 GW built2003: 3.8 GW built2004: 1.1 GW built2005: 1.1 GW built2006: 1.4 GW built2007: 1.1 GW built2008: 614 MW built2009: 1.9 GW built2010: 4.2 GW built2011: 3.4 GW built2012: 2.6 GW built2013: 6.6 GW built2014: 5.3 GW built2015: 4.0 GW built2016: 5.3 GW built2017: 8.5 GW built2018: 5.4 GW built2019: 2.2 GW built2020: 4.7 GW built2021: 1.9 GW built2022: 2.2 GW built2023: 5.0 GW built2024: 2.1 GW built2025: 663 MW built2026: 0 MW built2027: 1.2 GW under construction2028: 1.2 GW under construction19901995200020052010201520202025
Cumulative operating capacity
GW51103
Hover a bar for the year.

Built from assets operating today, by commissioning year — plants that closed before now are not in the data, so early years show only what survived. The forward bars are capacity physically under construction, not a forecast. A further 2.1 GW is under construction with no stated completion year. 6.4 GW of operating capacity has no commissioning year and sits outside the curve. Retirements are not tracked for this country, so no net-capacity line is drawn.

84% of Türkiye’s tracked capacity has an owner recorded.

AssetCapacityOwner
Türkiye solar project LXIX4.4 MW—
Yozgat solar project II4.4 MW—
Yozgat solar project VIII4.4 MW—
Şanlıurfa solar project LII4.4 MW—
Afyonkarahisar solar project LVIII4.3 MW—
Afyonkarahisar solar project XIX4.3 MW—
Balıkesir solar project XX4.3 MW—
Denizli solar project XLVIII4.3 MW—
Elâzığ solar project XIII4.3 MW—
Eskişehir solar project II4.3 MW—
Gaziantep solar project XIX4.3 MW—
Isparta solar project XXI4.3 MW—
Kayseri solar project XLIV4.3 MW—
Konya solar project LVII4.3 MW—
Mersin solar project XVI4.3 MW—
Sivas Belediyesi Sivas solar project I4.3 MW—
Sivas solar project V4.3 MW—
Türkiye solar project CCLXV4.3 MW—
Türkiye solar project CXIX4.3 MW—
Türkiye solar project LXXIV4.3 MW—
Uşak solar project VI4.3 MW—
Yozgat solar project XXVII4.3 MW—
Çorum solar project XVI4.3 MW—
Çorum solar project XVII4.3 MW—
Adana solar project X4.2 MW—
Adıyaman solar project X4.2 MW—
Adıyaman solar project XXIV4.2 MW—
Adıyaman solar project XXXVIII4.2 MW—
Afyonkarahisar solar project LXIX4.2 MW—
Afyonkarahisar solar project XC4.2 MW—
Antalya solar project LV4.2 MW—
Antalya solar project LXI4.2 MW—
Antalya solar project XIII4.2 MW—
Burdur solar project XVI4.2 MW—
Burdur solar project XXIII4.2 MW—
Bursa solar project IV4.2 MW—
Canakkale solar project XIX4.2 MW—
Derinkuyu solar project II4.2 MW—
Diyarbakır solar project XII4.2 MW—
Edirne solar project IV4.2 MW—
Elazığ solar project V4.2 MW—
Erzurum solar project XI4.2 MW—
Eskişehir solar project XXXII4.2 MW—
Gaziantep solar project XXII4.2 MW—
Kayseri solar project XCIX4.2 MW—
Konya solar project CXLIII4.2 MW—
Konya solar project LXXV4.2 MW—
Mardin solar project II4.2 MW—
Muğla solar project XVI4.2 MW—
Muğla solar project XVII4.2 MW—
Muğla solar project XXXI4.2 MW—
Niğde solar project XII4.2 MW—
Sakarya solar project IV4.2 MW—
Sivas solar project XXV4.2 MW—
Tortum Hybrid solar project4.2 MW—
Türkiye solar project CCCXIX4.2 MW—
Türkiye solar project CCI4.2 MW—
Türkiye solar project CCXVII4.2 MW—
Türkiye solar project CLXXXIII4.2 MW—
Uşak solar project XIII4.2 MW—
Çankırı solar project IX4.2 MW—
Çorum solar project XXIV4.2 MW—
Afyonkarahisar solar project XV4.1 MW—
Aksaray solar project VIII4.1 MW—
Aksaray solar project XXI4.1 MW—
Aydın solar project XIV4.1 MW—
Basmakci Biyokutle Enerji Santrali solar project4.1 MW—
Bilecik solar project XI4.1 MW—
Canakkale solar project I4.1 MW—
Denizli solar project XLII4.1 MW—
Denizli solar project XLIII4.1 MW—
Denizli solar project XVI4.1 MW—
Duru Regulatoru ve Hybrid solar project4.1 MW—
Elâzığ solar project XXI4.1 MW—
Eskişehir solar project XLV4.1 MW—
Kastamonu solar project I4.1 MW—
Kayseri solar project LXI4.1 MW—
Kayseri solar project LXII4.1 MW—
Kayseri solar project LXXXIV4.1 MW—
Kayseri solar project LXXXV4.1 MW—
Konya solar project XXVI4.1 MW—
Manisa solar project V4.1 MW—
Tokat solar project X4.1 MW—
Türkiye solar project CII4.1 MW—
Türkiye solar project CIII4.1 MW—
Türkiye solar project XVIII4.1 MW—
Çorum solar project XXXIV4.1 MW—
Şanlıurfa solar project XLIII4.1 MW—
Afyonkarahisar solar project LXXXVI4 MW—
Afyonkarahisar solar project XLII4 MW—
Amasya solar project IX4 MW—
Antalya solar project L4 MW—
Antalya solar project XVI4 MW—
Aydın solar project VI4 MW—
Balıkesir solar project X4 MW—
Bursa solar project VIII4 MW—
Ege Ii-Iii-Iv Hybrid solar project4 MW—
Gaziantep solar project LII4 MW—
Isparta solar project LIV4 MW—
Isparta solar project LVII4 MW—
Kadirli solar project IX4 MW—
Konya solar project CLI4 MW—
Konya solar project LII4 MW—
Konya solar project LXXXVIII4 MW—
Konya solar project XC4 MW—
Konya solar project XIII4 MW—
Samsun solar project XI4 MW—
Talas solar project4 MW—
Türkiye solar project CCLXXX4 MW—
Türkiye solar project CCVI4 MW—
Türkiye solar project CLI4 MW—
Türkiye solar project CLX4 MW—
Çankırı solar project XXIX4 MW—
Çorum solar project II4 MW—
Çorum solar project XI4 MW—
Çorum solar project XII4 MW—
Kapidag wind farm4 MW—
Adıyaman solar project XXIII3.9 MW—
Burdur Merkez solar project VII3.9 MW—
Bursa solar project XVIII3.9 MW—
Denizli solar project LXVII3.9 MW—
Elâzığ solar project I3.9 MW—
Gaziantep solar project XXIII3.9 MW—
Greeneco Jes-6 solar farm3.9 MW—
Kayseri solar project LVI3.9 MW—
Kayseri solar project LXXX3.9 MW—
Konya solar project CXLVIII3.9 MW—
Konya solar project XLVI3.9 MW—
Konya solar project XVII3.9 MW—
Kırıkkale solar project II3.9 MW—
Kırşehir solar project III3.9 MW—
Nevşehir solar project XV3.9 MW—
Niğde solar project XIX3.9 MW—
Türkiye solar project CCLXIII3.9 MW—
Türkiye solar project IV3.9 MW—
Türkiye solar project LII3.9 MW—
Uşak solar project XXI3.9 MW—
Van solar project I3.9 MW—
Aksaray solar project VII3.8 MW—
Antalya solar project II3.8 MW—
Antalya solar project XIX3.8 MW—
Burdur solar project X3.8 MW—
Bursa solar project XIII3.8 MW—
Diyarbakır solar project XXIII3.8 MW—
Elâzığ solar project VI3.8 MW—
Gaziantep solar project XLV3.8 MW—
Isparta solar project XXXII3.8 MW—
Kahramanmaraş solar project XXIII3.8 MW—
Kayseri solar project XXXIII3.8 MW—
Kütahya solar project V3.8 MW—
Kırıkkale solar project V3.8 MW—
Manisa solar project I3.8 MW—
Mavi Hybrid solar project3.8 MW—
Mersin solar project II3.8 MW—
Mersin solar project XXVIII3.8 MW—
Saren Sargin Enerji Tesisi solar project3.8 MW—
Sucati Hybrid solar project3.8 MW—
Türkiye solar project CCCXVI3.8 MW—
Türkiye solar project CL3.8 MW—
Türkiye solar project CXC3.8 MW—
Türkiye solar project CXL3.8 MW—
Türkiye solar project XLII3.8 MW—
Türkiye solar project XXI3.8 MW—
Van solar project XI3.8 MW—
Yozgat solar project X3.8 MW—
Şanlıurfa solar project XXII3.8 MW—
Tosunlar 1 geothermal power plant3.8 MW—
Afyonkarahisar solar project XXXIII3.7 MW—
Amasya solar project XI3.7 MW—
Antalya solar project XXVIII3.7 MW—
Bilecik solar project XVIII3.7 MW—
Bitlis solar project IX3.7 MW—
Canakkale solar project XII3.7 MW—
Denizli solar project XXVIII3.7 MW—
Elâzığ solar project XXIII3.7 MW—
Eskişehir solar project XXX3.7 MW—
Isparta solar project XLV3.7 MW—
Konya solar project CL3.7 MW—
Konya solar project CX3.7 MW—
Konya solar project IV3.7 MW—
Konya solar project LXXII3.7 MW—
Manisa solar project III3.7 MW—
Mersin solar project LI3.7 MW—
Mersin solar project XII3.7 MW—
Samsun solar project II3.7 MW—
Türkiye solar project CCCXIII3.7 MW—
Türkiye solar project CCXLIV3.7 MW—
Türkiye solar project CCXV3.7 MW—
Uşak solar project XL3.7 MW—
Uşak solar project XXIX3.7 MW—
Yozgat solar project IX3.7 MW—
Adıyaman solar project XXXVI3.6 MW—
Afyonkarahisar solar project LXXI3.6 MW—
Aksaray solar project V3.6 MW—
Antalya solar project XII3.6 MW—
Antalya solar project XLV3.6 MW—
Antalya solar project XXIX3.6 MW—
Aydın solar project I3.6 MW—
Ağrı solar project I3.6 MW—
Bilecik solar project XXVIII3.6 MW—
Canakkale solar project XI3.6 MW—
Denizli solar project IX3.6 MW—
Denizli solar project LXIII3.6 MW—
Erzurum solar project XIX3.6 MW—
Eskişehir solar project LXII3.6 MW—
Girlevik 3 Regulatoru Ve Karatus Hybrid solar project3.6 MW—
Kadirli solar project VII3.6 MW—
Kahramanmaraş solar project LV3.6 MW—
Kahramanmaraş solar project XLIV3.6 MW—
Kale Hybrid solar project3.6 MW—
Kilis solar project VI3.6 MW—
Muğla solar project XXXIX3.6 MW—
Sivas solar project VII3.6 MW—
Tokat solar project V3.6 MW—
Türkiye solar project CCCIII3.6 MW—
Türkiye solar project CCXXXII3.6 MW—
Türkiye solar project CXI3.6 MW—
Türkiye solar project CXIII3.6 MW—
Türkiye solar project XXXVIII3.6 MW—
Yozgat solar project XVII3.6 MW—
Adana solar project XXIV3.5 MW—
Adıyaman solar project XIX3.5 MW—
Adıyaman solar project XLI3.5 MW—
Adıyaman solar project XXXV3.5 MW—
Afyonkarahisar solar project LVI3.5 MW—
Afyonkarahisar solar project XXXV3.5 MW—
Aksaray solar farm3.5 MW—
Antalya solar project XVIII3.5 MW—
Aydın solar project VII3.5 MW—
Bilecik solar project XIV3.5 MW—
Bilecik solar project XVI3.5 MW—
Denizli solar project XLIV3.5 MW—
Elâzığ solar project XIX3.5 MW—
Emirler 1 Hybrid solar project3.5 MW—
Erzurum solar project II3.5 MW—
Isparta solar project X3.5 MW—
Kayseri solar project LXX3.5 MW—
Kayseri solar project XXXV3.5 MW—
Kilis solar project V3.5 MW—
Konya solar project CLV3.5 MW—
Konya solar project CXX3.5 MW—
Konya solar project LVIII3.5 MW—
Konya solar project LXVII3.5 MW—
Kütahya solar project IV3.5 MW—
Kütahya solar project XII3.5 MW—
Manisa solar project IX3.5 MW—
Mersin solar project LIV3.5 MW—
Nevşehir solar project XVI3.5 MW—
Niğde solar project XIII3.5 MW—
Niğde solar project XV3.5 MW—
Türkiye energy assets — page 9 · CapexAtlas